Switchgear Installation & Retrofit in the Florida Keys

If your 480V switchgear is tripping nuisance breakers, missing arc-flash labels, or running on parts you can't source anymore, you don't need another general electrician. You need a crew that can plan the outage window, coordinate the cutover, and pull the AHJ permit before shutdown day.

  • FL License # EC13004515
  • 55 electricians · Since 2009
  • Generac Authorized Dealer
  • $100K – $12M project capacity

Built for Keys Commercial Facilities

Outage Windows Are Tight Here

Planning the outage window is half the project for any occupied facility.

Outage Windows Are Tight Here

Monroe County's economy runs on occupied commercial property. In 2023, Accommodation and Food Services employed 6,867 people in the county per Data USA, which means most switchgear cutovers in Key West and the Keys happen around guests, tenants, or active operations.

Crews Keys to SW Florida

Our crews dispatch out of Key West and a new Summerland Key headquarters with a two-story stocked warehouse, plus a Naples office covering Marco Island to Fort Myers. That means breaker stock, MV/LV gear sections, and ATS components stage close to the job instead of riding the Overseas Highway on shutdown day.

Problems Our Crews Solve

What We Fix on Aging Switchgear

If your distribution gear is showing its age, you're probably dealing with one of four patterns: aging 480V gear that's tripping nuisance breakers or won't accept replacement parts, missing arc-flash labels, no clean window to shut anything down, or a coordination study that hasn't been updated in a decade.

Nuisance Trips on 480V Gear

Aging breakers, heat, and contamination cause trips you can't diagnose. We pull IR scans and recommend retrofit scope to extend the service life of your existing gear.

Arc-Flash Labels & Compliance

NFPA 70E requires field-marking on equipment likely to be worked on energized. We handle the study and the labels to meet safety standards. Circuit breakers and protective devices are evaluated for proper coordination.

No Window to Shut It Down

Hotels, marinas, and condos can't take a multi-day outage. We plan phased cutovers and temporary power around occupancy to protect operations and minimize disruption.

Parts You Can't Source

Obsolete breakers, relays, and trip units leave you exposed. Retrofit kits or section replacement get you back to current technology and code compliance, reducing the risk of failure.

Scope Options

Retrofit, Replace, or Install New

Targeted Section Retrofit

For facilities where one section, one breaker bank, or one set of relays has aged out but the bus and enclosure are still serviceable. We pull retrofit kits into the existing enclosure, swap protection devices, and bring the section back online inside a planned outage window. Lowest disruption, fastest payback, minimal downtime for your operations.

Full Lineup Retrofit

For lineups with widespread obsolescence: trip units no one stocks, missing arc-flash documentation, coordination studies older than your facility manager. We replace breakers, relays, metering, and protection across the lineup while keeping the existing enclosure and bus where condition supports it. Phased cutover by section maintains performance throughout the upgrade.

Full Switchgear Replacement

For gear that's past retrofit: corroded bus, deteriorated insulation, capacity that can't carry future load. We engineer the replacement lineup, coordinate temporary power, sequence the cutover, and bring the new gear through NETA acceptance testing and AHJ inspection before energization. Highest scope, highest disruption, but essential when existing panels and distribution equipment can no longer be maintained safely.

New Construction Switchgear

For GCs and developers integrating switchgear on a commercial build: main service, distribution, MCCs, ATS, and busway as part of the ground-up scope. We coordinate with the EE and the GC schedule from precon through energization.

Why Facility Managers Call Check Electric

Crews & Warehouse Inside the Market

Crews & Warehouse Inside the Market

Three offices across the Florida Keys and Southwest Florida mean breaker stock, MV/LV section parts, and ATS components stage near the job, not three counties away. When a shutdown window opens at 11 PM, we don't need an overnight delivery to start the cutover — Key West office est. 2009 under EC13004515, a two-story stocked Summerland Key warehouse, and a Naples crew for SW Florida sites.

Scope Range From Section to Lineup

Project capacity runs $100K to $12M on the commercial side. That covers single-section retrofits in an occupied condo all the way through ground-up distribution scopes on hotels, marinas, and storage facilities. The same crews that handle a $250K cutover also bid the $8M new-build distribution package, including coordination studies, selective coordination, NETA acceptance testing, and commissioning.

ATS, Generator & Compliance Scope

Switchgear retrofits rarely stop at the gear. Generac Authorized Dealer status lets us integrate transfer-switch retrofits into the same outage window, and calibrated ground impedance testing covers the medical and government work that needs certified documentation. Arc-flash labeling and PPE compliance handled in scope, with the NFPA 70E study run alongside.

From Site Walk to Commissioning

How a Switchgear Retrofit Runs

  1. 01

    Site Walk & Scope Review

    Our PM walks the electrical room, photographs the existing lineup, pulls nameplate data, and identifies bus condition, breaker obsolescence, and coordination gaps. Typically within one week of contact.

  2. 02

    Engineering & Proposal Build

    We build the retrofit-versus-replace recommendation, run preliminary coordination if needed, source breaker lead times, and propose phased outage windows. Proposal back within the agreed timeline.

  3. 03

    Permits & Inspection Coordination

    We pull the Monroe County electrical permit and coordinate inspection timing against the cutover window. After-hours inspections carry a two-hour minimum, which we factor into the schedule upfront.

  4. 04

    Cutover & Temporary Power

    Crew stages the gear, sets temporary power where the building can't take a full outage, sequences the cutover by section, and works the swing-in inside the agreed window. Typically overnight or weekend on occupied buildings.

  5. 05

    Testing, Commissioning & Labels

    NETA acceptance testing on new gear, IR scans on energized circuits, arc-flash labels applied per the updated study, and final inspection sign-off. You receive the documentation package before crew demobilizes.

Where Our Crews Dispatch

Three Offices, Two Regions

Crews dispatch out of three offices across the Florida Keys and Southwest Florida.

  • Key West
  • Stock Island
  • Big Coppitt Key
  • Sugarloaf Key
  • Summerland Key
  • Big Pine Key
  • Marathon
  • Duck Key
  • Islamorada
  • Tavernier
  • Key Largo
  • Naples / Bonita Springs / Marco Island

Switchgear Questions We Hear Most

Switchgear Installation & Retrofit FAQs

Can I upgrade switchgear without replacing it all?
Yes, in most cases a retrofit is the right call. If the bus and enclosure are sound, we replace breakers, trip units, relays, and metering inside the existing enclosure and bring the gear back to current code without a full lineup swap. Retrofit fits when outage windows are tight, parts are obsolete, or the goal is arc-flash and coordination compliance. Full replacement makes sense when the enclosure or bus is corroded, capacity has to grow, or the lineup can't support safe operation. We pull IR scans and condition data before recommending which path.
How is a switchgear retrofit priced in the Florida Keys?
Switchgear pricing scales with voltage class, scope, and outage logistics, so we quote per project rather than posting flat rates. The drivers we walk before pricing: voltage (LV 480V versus MV 5kV/15kV), number of sections, breaker count and type, whether temporary power is needed, coordination study scope, NETA acceptance testing, and AHJ permit timing. The proposal lists each line, the lead times, and the assumed outage window so nothing is buried. We work closely with facility managers to align the project budget with operational priorities.
Do you cover the Lower Keys, Marathon, and Key Largo?
Yes. Our Keys crews cover Key West through Key Largo, including Stock Island, Big Coppitt, Sugarloaf, Summerland Key, Big Pine, Marathon, Duck Key, Islamorada, and Tavernier. Southwest Florida sites from Marco Island to Fort Myers dispatch out of our Naples office. If your facility sits at the edge of either dispatch zone or in mainland Monroe County, call us anyway. Switchgear work is project-based, so we routinely scope sites that fall outside daily service-call radius.
Can you replace switchgear in an occupied building?
Yes. Most of our retrofit and replacement work happens in occupied hotels, marinas, condos, and commercial buildings where a multi-day shutdown is not on the table. The path is phased cutover by section, temporary power where the building cannot accept any downtime, and overnight or weekend swing-in windows scheduled around occupancy. We coordinate the inspection timing with Monroe County so the AHJ sign-off doesn't slip past the planned window. The proposal names the sections, the sequence, and the hours so the facility can communicate with tenants or guests.
How does payment and progress billing work?
Commercial projects are quoted per scope with milestone billing tied to mobilization, equipment delivery, cutover completion, and final commissioning. Net terms and progress draws are standard on six-figure-plus scopes; smaller service work is invoiced on completion. Specific payment methods and AIA-style billing are set in the contract. Ask during proposal review and we'll structure the schedule against your AP cycle.
What backs the work after the gear is energized?
Equipment carries the manufacturer's factory warranty (Generac, Eaton, Square D, ABB, and others depending on the lineup), which we register on your behalf at commissioning. The documentation package includes the NETA acceptance test results, the updated coordination study, the arc-flash labeling per NFPA 70E, and the Monroe County final inspection sign-off. State-certified electrical contractor EC13004515 is on file for the duration of the license cycle.
What if something doesn't behave right after cutover?
Call (305) 292-3369. We run NETA acceptance testing and IR scans before crew demobilizes, so most issues are caught on the bench rather than in the field. If a breaker, relay, or trip unit behaves out of spec after energization, our crew returns to diagnose and we coordinate any manufacturer claim on the gear. Arc-flash compliance is documented per OSHA 29 CFR 1910.335 and NFPA 70E so the labels match the actual incident energy on the gear, not a default sticker.
What does the first conversation look like?
Send a note through the contact form or call (305) 292-3369. Tell us the facility type, the voltage class, what triggered the project (trips, obsolescence, arc-flash gap, capacity growth), and any outage constraints. Our PM schedules a site walk within roughly one week, photographs the lineup, pulls nameplate data, and follows up with a retrofit-versus-replace recommendation. Walking the room together is the fastest path to a defensible proposal.

Plan the Retrofit Before the Breaker Forces It on You

Planned cutovers across the Florida Keys cost less than emergency replacement on a Saturday at midnight. Contact us to discuss your commercial electrical needs · Call (305) 292-3369.